INTERCULTURAL DESIGN - PROJECT 2 (FIELD STUDY)


14/01/19 - 25/01/19 (Week 2 - Week 3)
Yeap Phay Min (0331073)
Intercultural Design
Project 2 - Field Study 



INSTRUCTIONS




21/01/19 - 26/01/19 (Week 3)

After the proposal was completed, it's time to pack our bags and head to Korea! During our 6 days there, we got to visit various different places which gave us a chance to explore and collect the necessary data needed.

Here is a summary of the places we went in Korea!







As for data collection, my topic is regarding colours and motifs. Before heading to Korea, my group members and I agreed to walk separately, that way we can collect various different data and shared them among each other once we're back.

Throughout the days spent in Korea, I got to observe and collect various necessary data which was great. These were mainly documented in the form of photographs, and I also collected brochures and souvenirs that applies to my topic of interest.

Here's an overview of some of the photographs taken.





Here's some of the brochures and souvenirs collected as part of the data collection.



27/01/19 - 31/01/19 (Week 4)

Once we were back from Korea, my group found a time to meet up and share the data we collect among ourselves. We also started to work on our slides to present our findings during our trip. While discussing, we had similar and also different data collected with was great.


01/02/19 (Week 4)

It's presentation day! Here are the slides prepared by my group.




FEEDBACK: Mr Charles mentioned that our explanation was detailed and well explained. As for now, we need to work on the idea for the final outcome.

Comments

Popular Posts